Professional estimators in commercial construction put 10 real drawing sets through Pinpoint and reviewed every line it produced, in the app, against the drawings. This is what they found, exported with no filters applied: every item, every division, and all 13 lines they wrote themselves — the 5 misses and the 8 that were not ours to find — printed in full below with the reasoning attached.
Pinpoint reads the set and writes a scope of work. An estimator then goes through it item by item in the app, and the export records what they did to each one. Those records are not equally interesting, and treating them as if they were is how an accuracy number stops meaning anything.
The accuracy figure on this page comes out of the last of those four and nothing else: the added lines that were genuinely missing, over every row in the export. Rewording is style. Excluding is a decision about the proposal. Neither is netted against the number in either direction. And not every added line is a miss — the next section splits all 13 of them and shows both figures.
Pick a project, or leave it on all of them. Toggle a series off to rescale the bars — hiding the excluded items is the quickest way to see what the estimator actually kept. A red chip is a division we missed something in; an amber chip is a line the estimator added that turned out to be a duplicate or absent from the documents. Click the row to read either.
Not a sample. Every item a reviewing estimator wrote themselves, across all 4116 lines, exactly as they wrote it — and what each one turned out to be. 5 of them are ours; the rest are a duplicate of a line Pinpoint already wrote, or scope that appears in no drawing and no specification.
1272 of these 4116 items were switched off by the estimator. If that reads like an error rate, it is worth saying plainly what it is instead.
Excluding a line does not mean it was wrong. It means the estimator decided it did not need to be in the proposal. Most of these are standard and assumed — the one-year warranty every contract already carries, final cleaning, code-required work every bidder is doing and nobody itemises. The scope is still being performed and still being priced; writing it down would just make the proposal longer than anyone will read.
Nothing is deleted when it is excluded. It stays in the export, tied to its sheet, with the exclusion recorded — which is how these figures exist at all.